Sl. No.ParticularsUnitRate
1Shuttering for FootingPer Sq. Mtr.320.00
2Column box shuttering and deshuteringPer Sq. Mtr.320.00
3Starter Making1 No.350.00
4Starter fixing1 No.200.00
5Board MakingPer Sq. Mtr.220.00
6Slab and beam shuttering and deshutteringPer Sq. Mtr.320.00
7Stair Case beam and waste slab in riserPer Sq. Mtr.350.00
8Chhajja Lintel and other worksPer Sq. Mtr.350.00
9Staging work above 3 mtr height and additional supportPer Cu. Mtr.85.00
10Carpenter and Barbender rateNo/8 Hrs.950.00
11Helper N.M.R rateNo./8 Hrs.750.00
12Lift Wall and retaining wallPer Sq. Mtr.320.00
13Ramp ShutteringPer Sq. Mtr.350.00
14Starter fixing lift wall and retaining wallPer Run Mtr.320.00
15Shuttering material shifting from storeyard to sitePer Sq. Mtr.150.00
16Lifting charges floor to floor from second slabPer Sq. Mtr.40.00
17Steel Work 8mm & 32mmPer Ton9500.00
18Mivan shuttering & deshutteringPer Sq. Mtr195.00
19Lifting charges mivan materials every floorPer Sq. Mtr5.00
20Bracket jhali FixingPer Run Mtr175.00